Industrial Cybersecurity (OT): 82% of Critical Networks Lack Effective Segmentation
Security audit of Operational Technology (OT) networks in 35 industrial plants across energy, manufacturing, and utilities sectors in Argentina, Brazil, and Chile revealed that 82% of critical networks lack effective segmentation from the corporate network (IT). In 68% of cases, it was possible to reach critical Programmable Logic Controllers (PLCs) from the administrative network via simple lateral movements in under 4 hours of controlled penetration testing. Insecure industrial protocols (Modbus TCP, unencrypted DNP3) were detected in 94% of OT networks without secure encapsulation. 76% of SCADA systems run on obsolete, unsupported operating systems (Windows 7/XP) that cannot be patched. IEC 62443 standard evaluation showed an average maturity level 1 (initial) compliance in 71% of plants, with critical deficiencies in third-party account management (maintenance vendors with unsupervised remote access in 88% of cases).
Field evidence



Key Questions
- Is IT/OT segmentation effective? — Not in 82% of cases. Jumping from corporate to industrial networks is possible in under 4 hours in 68% of plants.
- Which vulnerabilities are most critical? — Obsolete OS (76%), insecure protocols (94%), and unsupervised vendor remote access (88%).
- What is the average maturity level? — Level 1 (Initial) of IEC 62443 in 71% of plants.
Methodology
Normative framework
IEC 62443 (series 2-1, 3-2, 3-3); NIST SP 800-82r3 (Guide to Industrial Control Systems Security); Purdue Reference Model; CIS Controls v8 (IG2/IG3 adapted to OT).
Research protocol
ON-SITE technical audit in 35 industrial plants (energy, manufacturing, utilities) across 3 countries. Controlled segmentation testing (IT->OT pivoting) and passive traffic listening. Modbus/DNP3 traffic analysis for protocol vulnerability detection. Maturity evaluation against IEC 62443-2-1 and IEC 62443-3-3.
Want to apply these findings?
Schedule an assessment and we'll turn data into concrete action.
Schedule assessment